Organization
Stimpel-Wiebelhaus Associatesshow partners CVRWQCB
Program website
view
Plan contactCorkey Harmon (530) 223-6605
|
Start date | 07/31/2008 |
End date | None |
Objectives | The discharger s facility consists of; a limestone quarry, rock crushing and screening plant, aggregate stockpiles, unpaved roadways, office building, portable toilets, shop building, and aboveground petroleum storage. The discharger intends to install a hot mix asphalt concrete plant within the next two years. Wastes generated at the facility include: domestic wastewater and waste petroleum products. Potential wastes include: polluted dust control wastewater and polluted storm water runoff. |
Annual budget | None |
|
Basins & sub-basins monitored
- Sacramento River (Sacramento River)
|
|
Sites Monitored
Name |
Code |
Latitude |
Longitude |
Map |
Stillwater Creek, West Fork, above monitoring location EFF-001
|
RSW-001 |
40.725999 |
-122.302427 |
locate |
Stillwater Creek, West Fork, 50 ft below monitoring location EFF-003
|
RSW-002 |
40.726785 |
-122.304356 |
locate |
West Fork of Stillwater Creek, approximately 50’ below monitoring location EFF-003.
|
RSW-003 |
40.725414 |
-122.331682 |
locate |
|
Parameters Monitored
Group | Parameters | Frequency |
General Water Quality |
Electrical Conductivity (EC) , Hardness, pH, Total Dissolved Solids (TDS), Total Suspended Solids (TSS), Turbidity |
Annual, Monthly, Daily |
Hydrology |
Flow |
Daily |
Major Ions & Minerals |
Cyanide |
Annual |
Mercury |
Mercury |
Annual |
Metals & Trace Elements |
Aluminum, Antimony, Beryllium, Cadmium, Chromium III, Chromium VI, Copper, Copper , Iron, Lead, Lead , Manganese, Nickel, Selenium, Silver, Thallium, Thallium , Zinc, Zinc |
Annual, Monthly |
Priority Pollutants |
Priority Pollutants |
Annual, Biannual |
Water Toxicity |
Toxicity (chronic) - Ceriodaphnia, Toxicity (chronic) - Fathead minnow, Toxicity (chronic) - other |
Quarterly |
|