Download Excel NPDES Self Monitoring Program Sierra Pacific Industries, Camino Lumber Mill
|
Organization
Central Valley Regional Water Quality Control Boardshow partners Sierra Pacific Industries
Program website
view
Plan contactVictor Vasquez (916) 464-4623 [email protected] |
Start date | 01/27/2005 |
End date | None |
Objectives | The facility processes approximately 115 million board feet of construction grade lumber annually. Liquid wastestreams generated from the sawmill operations include log deck runoff, water utilized in the barking operations, filter backwash from boiler supply water treatment, boiler blowdown, condensate from the kilns, runoff from the maintenance area, and stormwater. Domestic wastewater is treated in a septic system and discharged to a leach field regulated by the County. Boiler blowdown may not include chemicals for corrosion control, biocides or any other chemical additives if the discharge is commingled with log deck runoff and/or discharged to surface waters. |
Annual budget | None |
|
Basins & sub-basins monitored
- Sacramento River (Sacramento River)
|
|
|
map
|
Sites Monitored
Name |
Code |
Latitude |
Longitude |
Map |
North Canyon Creek, DS at Larson Road, between the waterfall and water wheel of Larson Park
|
R-1 |
38.751937 |
-120.682988 |
locate |
North Canyon Creek, 100 ft DS from the confluence with unnamed tributary
|
R-2 |
38.753896 |
-120.688006 |
locate |
|
Parameters Monitored
Group | Parameters | Frequency |
General Water Quality |
Hardness, pH, Turbidity |
Monthly, Weekly |
Hydrology |
Flow |
Weekly |
|
Data Products Available
|