Download Excel

NPDES Self Monitoring Program
Southern CA Edison Company Balsam Meadows Hydroelectric Project Eastwood Powerhouse Facility

Organization

Central Valley Regional Water Quality Control Board
show partners
Southern CA Edison

Program website

view

Plan contact

Matt Scroggins
559-445-6042
[email protected]
Start date 06/24/2005
End date None
Objectives This Order regulates the discharge of treated and untreated wastewater to Shaver Lake and North Fork Stevenson Creek, both waters of the United States. The Discharger submitted a Report of Waste Discharge, dated 18 March 2004, and applied for a permit renewal to discharge waste under the NPDES. The underground Facility enerates hydroelectric power through a single pump-turbine connected to a motor/generator and it is part of the Balsam Meadows Hydroelectric Project. The Balsam Project includes a 5, 900-foot diversion tunnel connecting the existing Hungtington-Pitman-Shaver Conduit, a 4,320-foot power tunnel, an access tunnel, a construction tunnel used to store equipment and access different levels of the Facility, and a 7, 500-foot tailrace tunnel with a 16-foot horseshoe section leading to Shaver Lake. The Balsam Project also includes the Balsam Meadows Forebay, a 2,100 acre-foot storage reservoir from which water flows to the Facility. During off-peak electrical consumption hours, water from Shaver Lake may be pumped into the forebay for power generation use the following day.
Annual budget None

Basins & sub-basins monitored

  • San Joaquin River (Southeast)
map

Sites Monitored

Name Code Latitude Longitude Map
Stevenson Creek, North Fork, 250 ft US from discharge from access tunnel
R-1 37.139564 -119.251235 locate
Stevenson Creek, North Fork, 250 ft DS from discharge from access tunnel
R-2 37.138487 -119.25272 locate
Shaver Lake, 25 to 125 ft from discharge
R-3 37.1289 -119.267168 locate
Shaver Lake, within 25 ft of pt of discharge from the tailrace Tunnel
R-4 37.129722 -119.265212 locate

Parameters Monitored

GroupParametersFrequency
General Water Quality Dissolved Oxygen (DO), Hardness, pH, Specific Conductance [EC @ 25 deg C], Temperature, Turbidity Biannual, Monthly
Hydrology Flow Monthly
Priority Pollutants Priority Pollutants Other

Data Products Available

ItemAvailable OnlineURLAvailable by RequestComment
Monitoring Plan Yes http://www.waterboards.ca.gov/... Yes
Other No Yes Discharger self-report
bort